Design and Execution of Retaining Structure

Retaining Structure Type: Concrete Pile & Steel Soldier & Anchoring

Depth: 15 m

Project Completion Year: 2014

Challenges:

Soil stabilization below the groundwater level

High rise nearby structures

Seepage from old underground wastewater conduits

Installation of Tower Crane in the excavation edge