Hirad Hotel
Design and Execution of Retaining Structure
Retaining Structure Method: Steel Pile & Concrete Pile & Anchoring & Strut
Depth: 22 m
Project Completion Year: 2014
Challenges:
Soil stabilization below the groundwater level
270 degree edge
Narrow soil layer between excavation area and nearby structure
High-rise nearby structures
Installation of Tower Crane in the excavation edge
Seepage from old underground wastewater conduits