Mobin Hotel
Design and Execution of Retaining Structure
Retaining Structure Method: Concrete Pile & Anchoring
Depth: 24 m
Project Completion Year: 2019
Challenges:
Concrete Piles Should have been used as part of main structure
Seepage from old underground wastewater conduits
Several changes in final depth
Installation of Tower Crane in the excavation edge